000 03725naaaa2200421uu 4500
001 https://directory.doabooks.org/handle/20.500.12854/38129
005 20220219185653.0
020 _a9781780401171
041 0 _aEnglish
042 _adc
072 7 _aTQ
_2bicssc
072 7 _aPDG
_2bicssc
072 7 _aTQ
_2bicssc
100 1 _aGernaey, Krist V.
_4edt
700 1 _aJeppsson, Ulf
_4edt
700 1 _aGernaey, Krist V.
_4oth
700 1 _aJeppsson, Ulf
_4oth
245 1 0 _aBenchmarking of Control Strategies for Wastewater Treatment Plants
260 _bIWA Publishing
_c2014
506 0 _aOpen Access
_2star
_fUnrestricted online access
520 _aWastewater treatment plants are large non-linear systems subject to large perturbations in wastewater flow rate, load and composition. Nevertheless these plants have to be operated continuously, meeting stricter and stricter regulations. Many control strategies have been proposed in the literature for improved and more efficient operation of wastewater treatment plants. Unfortunately, their evaluation and comparison – either practical or based on simulation – is difficult. This is partly due to the variability of the influent, to the complexity of the biological and biochemical phenomena and to the large range of time constants (from a few minutes to several days). The lack of standard evaluation criteria is also a tremendous disadvantage. To really enhance the acceptance of innovative control strategies, such an evaluation needs to be based on a rigorous methodology including a simulation model, plant layout, controllers, sensors, performance criteria and test procedures, i.e. a complete benchmarking protocol.  This book is a Scientific and Technical Report produced by the IWA Task Group on Benchmarking of Control Strategies for Wastewater Treatment Plants. The goal of the Task Group includes developing models and simulation tools that encompass the most typical unit processes within a wastewater treatment system (primary treatment, activated sludge, sludge treatment, etc.), as well as tools that will enable the evaluation of long-term control strategies and monitoring tasks (i.e. automatic detection of sensor and process faults). Work on these extensions has been carried out by the Task Group during the past five years, and the main results are summarized in Benchmarking of Control Strategies for Wastewater Treatment Plants. Besides a description of the final version of the already well-known Benchmark Simulation Model no. 1 (BSM1), the book includes the Benchmark Simulation Model no. 1 Long-Term (BSM1_LT) – with focus on benchmarking of process monitoring tasks – and the plant-wide Benchmark Simulation Model no. 2 (BSM2). 
536 _aKnowledge Unlatched
540 _aCreative Commons
_fhttps://creativecommons.org/licenses/by-nc-nd/4.0/legalcode
_2cc
_4https://creativecommons.org/licenses/by-nc-nd/4.0/legalcode
546 _aEnglish
650 7 _aEnvironmental science, engineering & technology
_2bicssc
650 7 _aIndustrial applications of scientific research & technological innovation
_2bicssc
650 7 _aEnvironmental science, engineering & technology
_2bicssc
653 _aTechnology & Engineering
653 _aEnvironmental
653 _aGeneral
653 _aScience
653 _aApplied Sciences
653 _aScience
653 _aEnvironmental Science (see Also Chemistry
653 _aEnvironmental)
856 4 0 _awww.oapen.org
_uhttps://library.oapen.org/bitstream/20.500.12657/43788/1/external_content.pdf
_70
_zDOAB: download the publication
856 4 0 _awww.oapen.org
_uhttps://directory.doabooks.org/handle/20.500.12854/38129
_70
_zDOAB: description of the publication
999 _c36901
_d36901